220kV Power Transformer
EPD
Zhejiang CHINT Electrics Co., Ltd.
Asia-China-shanghai
SFZ-150000/220
a single unit of transformers operating for 35 years
Carbon Footprint Message
System Boundary: Cradle to Grave
Reporting Period: 2021-01-01 ~ 2021-12-31
Total emission: 38,723.5000 tCO₂e
Stage emissions:
Upstream
1,100.0000 tCO₂e
2.84 %
Core
35.9000 tCO₂e
0.09 %
Distribution
19.7000 tCO₂e
0.05 %
Installation, Use & Maintenance
37,500.0000 tCO₂e
96.84 %
End of Life
67.9000 tCO₂e
0.18 %
Conclusion: The product of power transformer SFZ-150000/220 has a GWP of about 38723.5 tCO2-eq and the “Use & Maintenance-Phase” is the main contributor with 96.8 % of the emissions. Even though the calculation scheme with an operation always at full load is not very likely for this device and the emissions strongly depend on the CO2 factor of the electricity mix – the “real” emissions should therefore be significantly lower – the importance of this life cycle stage can be seen clearly. Based on this knowledge special attention should be paid to an application optimized design of the whole product system and the manufacturer could do some analyses and statistics on energy consumption in that stage in the future to have result that is more accurate.
Certification File
Environmental Product Declaration
TÜV Rheinland
CN2269GD001
2022-12-12
CEW Consortium Blockchain
2023-03-07
861148
0x1c25e5a8f80ad92602d742903914e148c66586a2e65ef111fb2783649801f659
0x41897af12085bdd6d2316b1c0e6e69d17160f0801461342002eef3d27f61d7f3
View Blockchain Details